洋書を”低価格”で”スピーディ”にご提供。
ようこそJPサイトへ Guest | ログイン | メインページ | お問い合わせ | 図書館/研究機関
Shopping from USA? Shop in Your Local Currency, Visit http://www.printsasia.com

Gorai River Restoration Project : Feasibility Report Annex I : Social Impact Assessment Vol. 6

People's Perspectives for the National Water Management Plan People's Participation and Consultation Programme - Rounds 1 and 2 Condensed Report

People's Perspective ...

 

当ショップ価格: ¥ 2599

Comprehensive Disaster Management Programme : Inception Report - Policy, Programme and Partnership Development Unit, March 17, 2004 Reducing Vulnerability of the Poor by Strengthening the Capacity of the Bangladesh Disaster Management Systems to Reduce Unacceptable Risks and Improve Response and Recovery Activities

Comprehensive Disast ...

 

当ショップ価格: ¥ 3099

Draft Development Strategy : National Water Management Plan Project Annex K : Data Management; Annex L : Basic Human Needs Vol. 9

Draft Development St ...

 

当ショップ価格: ¥ 8066

Gorai River Restoration Project : Feasibility Report Annex F : Geotechnical Investigations; Annex G : River Training Works - Design Vol. 4

Gorai River Restorat ...

 

当ショップ価格: ¥ 8066

Second Coastal Embankment Rehabilitation Project - Final Report, Vol. II Annex 1, 2 and 3 Vol. II

Second Coastal Emban ...

 

当ショップ価格: ¥ 7733

Main Report Vol. 1

Main Report Vol. 1

 

当ショップ価格: ¥ 4099

Mathematical Modelling and Detail Feasibility Study of Sagarkhali - Borobeela Drainage Project : Final Report May, 2001 4 Vols.

Mathematical Modelli ...

 

当ショップ価格: ¥ 6084

Main Report Vol. 1

Main Report Vol. 1

 

当ショップ価格: ¥ 10299

Principles and Practices of Water Management 1st Edition,8177541838,9788177541830
63 %

Principles and Pract ...

S.C. Panda

定価: ¥ 5450

当ショップ価格: ¥ 1999

Dryland Farming in India Constraints and Challenges,8171320813,9788171320813

Dryland Farming in I ...

J.L. Raina

当ショップ価格: ¥ 2475

Compartmentalization Pilot Project Tangail : Final Report Annex G-I

Compartmentalization ...

 

当ショップ価格: ¥ 5525

Draft Development Strategy : National Water Management Plan Project Annex M : Technical Options; Annex N : Project Profiles Vol. 10

Draft Development St ...

 

当ショップ価格: ¥ 8066

Compartmentalization Pilot Project Tangail : Final Report Annex D-F

Compartmentalization ...

 

当ショップ価格: ¥ 7537

Compartmentalization Pilot Project Tangail : Final Report Annex A-C

Compartmentalization ...

 

当ショップ価格: ¥ 9399

Summary Report Based on Studies Carried Out Under the Flood Action Plan - Annexures

Summary Report Based ...

 

当ショップ価格: ¥ 4170

Draft Development Strategy : National Water Management Plan Project Annex H : Institutions; Annex I : Regulatory and Economic Instruments Vol. 7

Draft Development St ...

 

当ショップ価格: ¥ 8066

Feasibility Study on the North Rajshahi Irrigation Project, Vol. 4 Drawings

Feasibility Study on ...

 

当ショップ価格: ¥ 879

Reforming BWDB Twinning Mission - I, November 18-December 3, 2001: Final Report

Reforming BWDB Twinn ...

 

当ショップ価格: ¥ 3853

Bank Protection Pilot Project FAP 21 : Final Project Evaluation Report, Volume I (Draft) Main Report, July 2001

Bank Protection Pilo ...

 

当ショップ価格: ¥ 2599

Gorai River Restoration Project : Feasibility Report Annex H : Economic Analysis Vol. 5

Gorai River Restorat ...

 

当ショップ価格: ¥ 8066

World Investment Report, 2003 FDI Policies for Development : National and International Perspectives Indian Edition,8185040753,9788185040752

World Investment Rep ...

 

当ショップ価格: ¥ 3899

Draft Development Strategy : National Water Management Plan Project Annex J : Economics Vol. 8

Draft Development St ...

 

当ショップ価格: ¥ 6579

National Water Management Plan Project : Draft Development Strategy, Volume No. 5 Annex D : Legacies and Lessons, Annex E : Consultation

National Water Manag ...

 

当ショップ価格: ¥ 5588

Draft Development Strategy : National Water Management Plan Project Annex A : Policies; Annex B : Projections Vol. 3

Draft Development St ...

 

当ショップ価格: ¥ 3599

Compartmentalization Pilot Project Tangail : Final Report

Compartmentalization ...

 

当ショップ価格: ¥ 12138

Compartmentalization Pilot Project Tangail : Final Report - Main Report

Compartmentalization ...

 

当ショップ価格: ¥ 26018

River Morphology in Bangladesh Status, 2002

River Morphology in ...

Mohammad Inamul ...

当ショップ価格: ¥ 2829

Draft Development Strategy : National Water Management Plan Project Annex F : Social Analysis; Annex G : Environment Vol. 6

Draft Development St ...

 

当ショップ価格: ¥ 8066

Validation of Decision Support System (DSS) to Support Annual CADP Maintenance, Meghna Dhonagoda Irrigation Project (MDIP) Final Report, March 2002

Validation of Decisi ...

 

当ショップ価格: ¥ 5092

Gorai River Restoration Project : Draft Feasibility Report, Vol. 3 Annex B : Hyderology; Annex C : River Morphology; Annex D : Mathematical Modelling; Annex E : Physical Modelling

Gorai River Restorat ...

 

当ショップ価格: ¥ 9137